@thesis{thesis, author={Saputra M Reza Imam and Uno Bintang Sudibyo Uno Bintang}, title ={STUDI POTENSI ANGIN DI DAERAH BIMA NUSA TENGGARA BARAT UNTUK PEMBANGKIT LISTRIK TENAGA BAYU}, year={2017}, url={http://156.67.221.169/1095/}, abstract={Electrification ratio decreased due to population growth caused problems of shortage of supply of electrical energy in Indonesia, especially for eastern region of Indonesia, to be able add to supply of electrical energy it would be good to exploit the natural resources provided, one with utilization of the wind energy as a replacement for unconventional energy , Indonesia is a tropical region which has the potential of the wind energy with a speed of 3.5 m / s - 7 m / s is sufficient for built-in Power Plant Wind / Bayu (PLTB) in particular to provide electricity for isolated areas, especially areas that has not received electricity from Perusahaan Listrik Negara (PLN). In this thesis will be performed to analyze the potential of wind energy in Bima, West Nusa Tenggara. By using the Hardware ACU RITE and EB-1KW wind turbine.} }