@thesis{thesis, author={Siregar Masbah R.T and WICAKSONO DICKO AJI}, title ={ANALISA DAYA KELUARAN MODUL SURYA DAN SIMULASI PERHITUNGAN ENERGI BERKELANJUTAN (STUDI KASUS PLTS 15 kWp DI PULAU PANJANG, BANTEN)}, year={2015}, url={http://156.67.221.169/1223/}, abstract={Power consumption has a role major in the implementation of development that aims to improve the welfare and economic level. But in reality, not all people can enjoy electricity , especially those living in remote or isolated areas which far from the city center like in Pulau Panjang, Banten. Thus , the government has built a source of electrical energy , one of them is Solar Power system. Most of them use electrical power that can sometimes exceed the power generated from a Solar Power system , so the Solar Power system are not able to fulfill their needs. The energy that can be generated from Solar Power system in Pulau Panjang is about 33 kWh/day. Therefore , it takes energy forecasting that aims to make the energy they need can be fulfilled according to the energy that can be generated by a Solar Power System in the future.} }