@thesis{thesis, author={Al Ansor Syihabuddin and Marnanto Donny}, title ={ANALISIS HIDROLOGI SUNGAI GENTENG DENGAN METODE NAKAYASU DAN FJ.MOCK UNTUK PEMBANGKIT LISTRIK TENAGA MINI HIDRO.}, year={2017}, url={http://156.67.221.169/124/}, abstract={The abundance of hydro power potency in Indonesia to be used as power plants can help meet the electrical energy needs of a growing, particulary in remote and isolated areas. Mini Hydro Power Plant (PLTM) is one of the power plants that utilize water to generate electrical energy. The appropriate plant planning sustain the palnt?s operation optimaly. In order to know the river discharge planning dependable discharge in determining the capacity of a power plant and design flodd discharge required precise hydrological analysis and direct survey at the area as well as comparative data to know the actual conditions. This thing becomes very important as a study of the potency of the Mini Hydro Power Plant (PLTM). The data of Rainfall, climatology, topographical map, foresty map, geological map, soil and river characteristic become important sources for plant planning. Where that will obtain design flood discharge and dependable discharge to design a weir, locate the power house and determine the capacity of the power plant with other supporting data such as height of fall, whole instrument?s efficiency, the force of gravity and the density of water.} }