@thesis{thesis, author={FADHILAH NUR and Marsudi Djiteng}, title ={ANALISA PROSES PABRIKASI KABEL TANAH 150 KV BESERTA PENGUJIANNYA}, year={2015}, url={http://156.67.221.169/1327/}, abstract={In the development of the distribution network, especially in big cities with high load density (greater than 50 ), 150 kV line is often required in order to support the electricity needs of the people of Indonesia. In the big cities such as Jakarta, is very difficult to obtain government permission to build 150 kV overhead lines. A line of 150 kV underground cables can deliver a power of about 80 MVA. Underground cables with a voltage of 150 kV can be produced by the cable industry in the country and is estimated for 10 years to come, Indonesia will require 150 kV underground cables in large quantities (approximately 10 km / year - 20 km / year). In this paper will study the issue of 150 kV underground cable fabrication, and also will study the test in the laboratory. This discussion in accordance with the method performed by one of the factories in Indonesia , with a standard that refers to the IEC standard.} }