@thesis{thesis, author={Ispranyoto Edy and Sulthon Ibnu}, title ={STUDI KELAYAKAN PEMASANGAN PLTS ON GRID 500 KWP DI PT PANJI MUARA RAYA BALI}, year={2019}, url={http://156.67.221.169/1434/}, abstract={PT Panji Muara Raya is a company engaged in power plants, especially renewable energy PT Panji Muara Raya has a 2x1.1 MW Minihydro Power Plant. Because the power generated by PLTM is not sufficient from the value of the contract with PLN, PT Panji Muara plans to install Solar Power Plant (SPP) as a back up for PLTM. Before installation, the PV-VP needs to be assessed for its feasibility study, especially from a technical perspective. The SPP study used is SPP On-Grid or SPP which is directly connected to the grid. By using quantitative methods, the energy that will be produced by this solar power plant is 2035 kWh with the assumption of minimum irradiance. From the results of the feasibility test, it was concluded that the PV-VP is feasible to be installed by observing the results of the performance ratio (PR) which reached 73%.} }