@thesis{thesis, author={Hafidz Mohammad and RAHMATA TRIANA LATIFAH}, title ={PERENCANAAN UPRATING 250 kWp PEMBANGKIT LISTRIK TENAGA SURYA GILI AIR}, year={2019}, url={http://156.67.221.169/1470/}, abstract={The era of globalization has a consumptive effect on electricity, where there will be an increase in the use of electricity that is so high that it results in high consumption of electricity in society. This thesis will discuss planning uprating 250 kWp of Solar Power Plant because of several factors such as high irradiation of solar radiation and the availability of land in the Solar Power Plant area, in order to help fulfill the electricity needs of Lombok by adding solar panels and combiner boxes. This planning discuss about uprating Solar Power Plant without having to add an inverter unit because in this plan the inverter will work at its maximum capacity of 125 kW at 2 units. Result of planning it is expected to be a reference as well as an electrical practitioner so that compatibility between energy needs, prices and good quality can be obtained.} }