@thesis{thesis, author={ANUGERAH I GEDE KRISNA LINGGA and Suwarno Suwarno}, title ={PERBAIKAN JATUH TEGANGAN DENGAN MENGGUNAKAN KAPASITOR BANK PADA PENYULANG DURIAN 1 GH KUALA DUA}, year={2019}, url={http://156.67.221.169/1515/}, abstract={The distribution system is an electric power system that delivers electricity from the generator to consumers on a medium to low voltage scale. Where in the distribution of electrical energy there are several problems, one of which is voltage drop. Voltage drop is caused by the distance between the substation and the load and the distance between the masts is quite far. Which results in the distribution transformer being supplied with low voltage. To correct the voltage drop, a bank capacitor is installed. By means of load measurements so that the reactive power requirements, and capacitor placement are known. After that, measure the voltage before installing the capacitor and after installing the capacitor. At the time after installation of capacitors the voltage quality in the customer is good. At the simulation results the most optimum capacitor installation is at a distance of 15 km (30%) from the source. The capacity of the capacitor to be installed is 1.2 MVAR (Switch capacitor) when the peak load and 7 kVAR (Fix capacitor) when outside the peak load.} }