@thesis{thesis, author={Pahiyanti Novi Gusti and WAHYU PRATAMA AFIF}, title ={UPAYA PENEKANAN SUSUT ENERGI JARINGAN TR 1 FASA DENGAN PENERTIBAN PEMAKAIAN TENAGA LISTRIK DI PT. PLN (PERSERO) UP3 BINTARO}, year={2022}, url={http://156.67.221.169/5248/}, abstract={Energy shrinkage is the channel energy lost when distributing electricity to consumers, one of the factors on the non-technical side, is to affect the measurement of electrical energy in customers, based on the method of collecting data from kWh salur and kWh selling March as well as efforts to emphasize with P2TL from customer kWh measurements and meter error testing analysis as an identification of non-technical causes of shrinkage, namely by measuring the customer's active power consumption time and disk rotation handling time using a stopwatch. A total of 24 violations of group P(II) were found in the UP3 Bintaro area, including affecting the rotation of the disk should be 4.80 seconds when the application was 9.72 seconds so that the error meter did not match the meter class limit, namely class 1 is ± 1% and class 2 is ± 2%. From the results of energy losses, you can get a kWh saving of 404,836 kWh and a saving of rupiah of Rp. 583,946,177, the energy channeled by PT. PLN (Persero) UP3 Bintaro in March received a shrinkage value of 9.42%, after the implementation of P2TL shrinkage decreased by 9.19% the emphasis of P2TL shrinkage succeeded in minimizing the difference of 0.23% from non-technical shrinkage.} }