@thesis{thesis, author={Fujiyanti Linda and SEPRIYANTI ANGGI EKA}, title ={SIMULASI PENGOPERASIAN PEMBANGKIT LISTRIK TENAGA AIR (PLTA)}, year={2013}, url={http://156.67.221.169/531/}, abstract={Power plant works by changing the energy of water flowing (from the dam or waterfall) into mechanical energy (with the help of water turbines) and of the mechanical energy into electrical energy (with the help of generators). As for the difficulty of the operation of the power plant, among others, a lack of understanding of the user that is hard to understand about the process that occurs when an operation and the calculation gain power. . By utilizing existing simulation is expected to facilitate the user in understanding the abstract into something more concrete. This study uses a multimedia development, and then implemented into a computer program to assist in the operation of the simulation Hydroelectric Power Plant (HEPP). This study aimed to develop a computer program to generate a simulation application. The results of this study is a computer program with Visual Studio 2008 programming language in the form of simulation applications that are used to determine the operation of the simulation process Hydroelectric Power Plant (HEPP).} }