@thesis{thesis, author={Fahrezi Andi Muhammad Irgi and Husada Hendrianto}, title ={ANALISIS PERENCANAAN SISTEM PEMBANGKIT LISTRIK TENAGA SURYA OFF-GRID MENGGUNAKAN SOFTWARE PVSYST 7.2 PADA GEDUNG PERKANTORAN BADAN PENANGGULANGAN BENCANA DAERAH WATAMPONE, SULAWESI SELATAN}, year={2023}, url={http://156.67.221.169/5736/}, abstract={In this study, Solar Energy Power Plant planning will be made by utilizing office roofs because it is in accordance with the regulation of the Minister of Energy and Mineral Resources No.49 of 2018 regulating the basic things to encourage the acceleration of solar energy development, especially rooftop solar (Solar Panels). In this study using quantitative methods. Furthermore, designing solar power plants with field studies to find out the conditions and estimate the capacity of the Solar Energy Power Plant to be designed. After that, calculate the capacity and also perform energy calculations on the Solar Energy Power Plant. This Solar Energy Power Plant is designed to supply litrik supply with an estimated daily energy load requirement of around 39.81 kWh. In this Solar Energy Power Plant planning required land area, with 36 solar power 4 series and 9 parallel. the components needed in this planning are 2 SCC, 44 batteries and 1 inverter with the amount of Solar Energy Power Plant per year 15,621 kWh / year Performance Ratio (PR) in the Solar Energy Power Plant system as a reference that this system is feasible to be realized with a value of 85%. Initial investment of Rp.380,180,000 which includes costs for Solar Energy Power Plant system components and installation costs} }