@thesis{thesis, author={Tambunan Juara Mangapul and Wardhana Adhitya Wisnu}, title ={ANALISIS KELAYAKAN PEMBANGUNAN JARINGAN SUTM 20 KV LINTAS PULAU MENGGUNAKAN TOWER SUTT TIPE DD DI KEPULAUAN TOGEAN}, year={2023}, url={http://156.67.221.169/5744/}, abstract={Referring to the target of the National Electricity General Plan (RUKN) 2015-2034 of the Ministry of Energy and Mineral Resources in 2024 the electrification ratio of all regions in Indonesia is 100%. Therefore, Togean as one of the mainstay tourist destinations in Central Sulawesi Province must be immediately provided with electricity facilities. However, with the constraints of Togean Island which is far from the PLN electricity grid, several innovations need to be made, one of which is the construction of a 70 kV SUTT Tower, and is expected to increase the electrification ratio of PLN Tojo Una-Una Regency to 99.24% from the previous 96.83%. And the ratio of PLN-electrified villages increased to 83.56% from the original 77.4% in Tojo Una-Una Regency. In addition, although from a financial analysis it does not meet the standards, but with the importance of this development, it can be continued on the basis that PLN is operationally feasible in terms of distribution voltage on the SUTM and SUTR sides. Even though from a financial review nothing was feasible, because the investment value was smaller than the construction of PLTS and PLTD, the construction of SUTM with the SUTT tower was more considered to be carried out.} }