@thesis{thesis, author={Dini Hasna Satya and Ulinnuha Muhamad Munif}, title ={PERBANDINGAN ENERGY NOT SERVED PADA METODA PERBAIKAN CURRENT TRANSFORMATOR DI PELANGGAN 197 KVA ULP SAWANGAN UP3 DEPOK}, year={2023}, url={http://156.67.221.169/5761/}, abstract={In the process of distributing electrical energy to users, a metering and limiting device (APP) is required for the measurement of energy transactions. However, due to the age factor, the quality of kWh and current measurements has decreased in accuracy. To find out the error value on kWh meters and CTs requires special test equipment called emsyst. Metode of repair faulty kWh meters and CTs, it is necessary to replace them with new kWh meters and CTs. Unlike the availability of kWh meters, the replacement of new CTs uses the Shuntrip full replacement method, but due to the efficiency of the APP maintenance budget, there is a shortage of integrated APP/Shuntrip equipment supply. Therefore, it is necessary to find a CT repair method that is more efficient in terms of repair time, lower cost and minimizes Energy Not Served and CT error assessment results below the accuracy class limit. The CT replacement method provides a repair time of 40 minutes or 66.67% faster, saves work costs of Rp. 12,069,525.06 or 91.93% and minimizes ENS by 392.94 kWh or 66.5% than the full replacement of Shuntrip. The CT error assessment results before and after CT replacement are as good as the full Shuntrip replacement. The increase in accuracy on CT replacement on January 11-19, 2023 amounted to 523 kWh/day or 24.33%. There is a potential loss received by PT PLN (Persero) due to delays in repairing CT errors IDR 3,668,470.64 / month} }