@thesis{thesis, author={Diantari Retno Aita and Wulandar Made Vivi}, title ={ANALISIS PENGARUH INTEGRASI SCADA GI BANGKINANG BAY PASIR PANGAIRAN 1 KE SISTEM SUMATERA BAGIAN TENGAH}, year={2023}, url={http://156.67.221.169/5951/}, abstract={In this era of globalization, the need for electric power increases with the growth of industrial areas, residentil areas, and other areas. This will lead to an increase in rural and urban electricity consumers and is synonymous with the expansion of the need for electricity networks. When distributing electricity, it is also not free from disturbances during the distribution process. For this reason, the distribution reliability indec of the electric powe system is needed. Therefore, an appropriate and fast recovery time is needed so that the reliability index of electric power distribution is getting better. To speed up the handling of disturbances, the bays (conductors) that are frequently disturbed by SCADA are integrated into the Central Sumatera System. Data collection in this study was carried out at GI Bangkinang Bay Pasir Pangairan 1. In calculating the percentage of time outage that can be saved, the results is 81,624%, the total Energy Not Supplied (ENS) before being integrated into SCADA is 121,322 MWh dan the rupiah that can be saved after integration with SCADA is 15,165 MWh and Rp 153.365.018. The percentage of saving kWh when integrated into SCADA is 87,50%. The TLOD and TLOF values after SCADA integration were smaller than before integration into SCADA is 0,013 hours/100 kms and 0,074 times/100kms after integration into SCADA.} }