@thesis{thesis, author={Satya Dini Hasna and Sirait Deviana Fransiska}, title ={EVALUASI SISTEM KOORDINASI PROTEKSI UTAMA DAN PROTEKSI CADANGAN PADA TRAFO DAYA 60 MVA DI GI PEMATANG SIANTAR}, year={2023}, url={http://156.67.221.169/5968/}, abstract={Power transformers are the main components that are very important in the transmission system, so they must have protection from interference that can reduce transformer performance. The differential relay is the main protection in power transformers. Differential relays work by comparing the incoming current in the relay with the outgoing current in the relay. The relay detects interference and instructs a circuit breaker (CB) for the trip. The purpose of this study is to evaluate the differential relay protection system on a 60 MVA transformer when internal and external interference occurs to find out whether the relay is working in accordance with exsisting needs or needs to be resetting. The method used is by collecting the necessary data at a 150 kV substation which is then processed by mathematical calculations or manually and by simulating the work of differential relays using ETAP software. The result of the mathematical calculation is that the differential current setting value is 0.1 A. The results of the simulation of the differential relay work system using ETAP software, in internal interference show that the differential relay works at 0 ms and CB1 and CB2 work at 55 ms and 70 ms, while when there is an external disturbance the differential relay does not work but what works is the feeder side OCR relay detects a fault current (If) of 8347 kA at the time 2000 ms, therefore when the OCR relay will order the PMT to trip with a time of 70 ms.} }