@thesis{thesis, author={Handayani Oktaria and Siregar Jefriadi}, title ={STUDI KAPASITAS PEMUTUS TENAGA PEMBANGKIT LISTRIK TENAGA UAP LONTAR BANTEN PADA TAHUN 2020}, year={2018}, url={http://156.67.221.169/661/}, abstract={Electricity burden is the power generated by a power plant in order to assist and facilitate the activities of the community associated with electricity. The amount of load generated will affect the performance of a tool such as PMT in case of short circuit current due to overcurrent or other interference. This thesis discusses the study of power breaker capacity at the steam power plant in 2020. To be able to know how much load will be supplied by steam power plants then we must study and analyze. Linear regression method is one of many ways to find out how much peak load in the next year. In transformers 1,2 and 3 in 2020 supplying power of 407.14 MW, 364 MW and 338 MW, therefore the power supplied by steam power plants transmitted to GIS lontar must be careful. By 2020 the value of the short circuit current that occurs when done in the calculation 27,1629 kA and 36,734 kA.with the peak load growth in 2020. Power of that size can damage electrical equipment if the protection system is less effective and good. Therefore, if the peak load on the transformer is veElectricity burden is the power generated by a power plant in order to assist and facilitate the activities of the community associated with electricity. The amount of load generated will affect the performance of a tool such as PMT in case of short circuit current due to overcurrent or other interference. This thesis discusses the study of power breaker capacity at the steam power plant in 2020. To be able to know how much load will be supplied by steam power plants then we must study and analyze. Linear regression method is one of many ways to find out how much peak load in the next year. In transformers 1,2 and 3 in 2020 supplying power of 407.14 MW, 364 MW and 338 MW, therefore the power supplied by steam power plants transmitted to GIS lontar must be careful. By 2020 the value of the short circuit current that occurs when done in the calculation 27,1629 kA and 36,734 kA.with the peak load growth in 2020. Power of that size can damage electrical equipment if the protection system is less effective and good. Therefore, if the peak load on the transformer is very large then the capacity value of its PMT must also be greater than the load that is passed through it, so that later in 2020 the electrical equipment used will survive and function properly.} }