@thesis{thesis, author={Adham Fadil and Marsudi Baruno}, title ={KAJIAN UPAYA PERBAIKAN JATUH TEGANGAN DAN RUGI-RUGI DAYA DENGAN INTERKONEKSI PLTS PADA PENYULANG PHOTO GI KEMBANGAN}, year={2016}, url={http://156.67.221.169/821/}, abstract={Population growth rate continues to increase proportional to the increase in the energy capacity requirements every year. We know the general power plants are usually built away from residential areas. This raises new problems for the electricity providers are required to continuously improve the electric power supply and good continuity. One of the technical effort to overcome these problems and decrease the value of power loss and drop voltage on the system, by building a plant spread (distributed generation) is renewable energy at points far from the center of the generation and close to load centers. Photovoltaic plant is present as a solution by weighing the potential of solar energy is very good, an average of 4.80 kWh/m2/day. So that could be studied power loss and drop voltage on a distributed solar power generation after the operation at 20 kV distribution system, in this study applied to the feeder Photo in substation Kembangan. With the growth scenario assumed in the load feeder Photo by 6.2%, in 2016,2017,and 2018 reduce lower the drop voltage of 0.44%, 0,53% dan 0.45%. and then power loss of 9 kW, 9,5 kW, dan 10,6 kW.PLTS concept in distributed generation can only lower power loss and drop voltage during the day, so in order to optimize the reduction in power loss and drop voltage is needed other plants such as Waste Biogas Power Plant in order to cope with the load at night.} }