@thesis{thesis, author={Budi S Purnomo Willy and Tsauri Sofyan}, title ={Analisis Perbaikan Tegangan Dengan Pembangunan Gardu Sisipan Pada PLS001 PT.PLN Area Serpong}, year={2017}, url={http://156.67.221.169/895/}, abstract={This analysis based on the need for improvement of voltage profile on low voltage system at PLS001 substation in Serpong Area which experienced voltage drop and high load transformer. The method chosen to improve the voltage profile is the additional substation method, Installation of the substation on the distribution substation PLS 001 can improve the quality of the voltage and also can reduce the loss of PT. PLN (Persero) which in caused the voltage drop on low voltage system. With the installation of additional substations on PLS 001 can increase the income of PT. PLN (Persero) Area Serpong from Rp 64.926.306, - increased to Rp 92.395.128, -. The total rupiah saved is Rp 27,468,822 / month or Rp 329,625,864 / year, and with an investment cost of Rp 663,931,750 compared to the rescued kwh, it takes 24 months to return the investment.} }