@thesis{thesis, author={Ambarwati Inna Anisa and Handayani Oktaria}, title ={STUDI RUGI DAYA PADA JARINGAN TEGANGAN RENDAH GARDU DISTRIBUSI PJ 115 JURUSAN A DI PT PLN (PERSERO) DISTRIBUSI BANTEN AREA CIKOKOL}, year={2018}, url={http://156.67.221.169/950/}, abstract={The provision of continuous and stable electricity is an absolute requirement that must be met in meeting the needs of electric power. In meeting the needs of the lithric power, there is a division of the burdens that were initially uniform but due to the difference in ignition time, the loads caused a load imbalance that impacted on the supply of electric power. Due to the unbalance of the load on the low voltage network so that there will be a neutral flow. Excessive neutral currents arising from unbalanced loads between the phase channels, will cause overheating of the neutral channels. This heat is certainly a loss of power that should not have happened. So that indirectly contribute to rudi power, which continues to be minimized by PT PLN. From the calculation is known total power loss in PJ 115 majors A by 8.76%. The power losses incurred in PJ 115 still in accordance with SPLN no. 72 of 1987, the magnitude of the loss of power required to determine reliability on the system is 10%.} }