@thesis{thesis, author={Simanjuntak Daniel Bonatua}, title ={ANALISIS OPNAME PROGRESS KONSTRUKSI BANGUNAN GARDU INDUK TEGANGAN EKSTRA TINGGI (GITET) 500/275KV DI PT. MEDAN SMART JAYA DESA PAGAR DEWA KABUPATEN MUARA ENIM SUMATERA SELATAN}, year={2023}, url={http://eprints.ukmc.ac.id/12283/}, abstract={PT Medan Smart Jaya is a company engaged in the field of National Construction Services that builds various construction buildings. In this project , the construction of the 500/275kV Muara Enim Extra High Voltage Substation (GITET) was carried out by PT Medan Smart Jaya. The function and role of hospitalization is the process of checking or measuring the results of a job, one of which is construction work that has been carried out by PT Medan Smart Jaya. Based on the results of observational data during practical work on construction construction carried out by contractors PT Medan Smart Jaya, there are still often found procedures that are not appropriate or wrong when conducting hospitalization in construction construction. Inappropriate mistakes made by contractors PT Medan Smart Jaya is doing work that is not in accordance with the measurement standards that have been determined on the drawing or layout. The analysis used in this report is the analysis of factors that affect the effectiveness of project time and the impact on cost effectiveness of construction projects. For this reason, it is necessary to carry out stages and methods so that the measurements are in accordance with the cubication and layout that has been determined by PT Medan Smart Jaya.} }