@thesis{thesis, author={SABDA PAMUNGKAS CATUR}, title ={PENJADWALAN PRODUKSI DENGAN MENGGUNAKAN METODE CAMPBELL DUDEK AND SMITH UNTUK MEMINIMASI WAKTU PRODUKSI (Studi Kasus di UD. Arjasa, Batu Malang)}, year={2009}, url={https://eprints.umm.ac.id/10287/}, abstract={UD.ARJASA is an industry of manufaktur with multy product character with specification of different product but use same machine and needing different solution time to every product. This matter cause passed to work load every machine differ. This matter can cause incidence long totalizeing job time of product and inefficienty otherwise given by work sequence or correct encumbering, so that company cannot get optimal advantage In this research conducted analyse to determine sequence work of which can degrade makespan ( total of process time required to finish corps of job ) so that company can conduct thrift of that goodness from time facet and also from production cost facet by using method of Campbell Dudek And Smith From applying of Campbell Dudek And Smith method by nalyse, obtained better job scheduling from company job scheduling in this time . Makespan calculation of Campbell Dudek And Smith method obtained different job sequence with job sequence in company , thrift that happened is mean equal to 15% monthly. While for the comparison of production cost ( labour cost and expense usage of electricity ) pursuant to makespan between scheduling of CDS with scheduling of company obtained cost-saving with percentage of 16,5% monthly. } }