@thesis{thesis, author={Riswandi Riswandi}, title ={REVIEW DESAIN BANGUNAN PENGELAK BENDUNGAN SUKAMAHI DITINJAU DARI WAKTU DAN BIAYA PELAKSANAAN}, year={2018}, url={https://eprints.ummi.ac.id/582/}, abstract={River diversion a building that is functioned to divert river in order to be able to do inspection of geology condition, preparation and foundation improvement, and is begun the work of dam construction implementation. Sukamahi Dam which is located in Megamendung Subdistrict, Bogor Regency is a dry dam that aims to control Jakarta flood and it has puddle capacity as much as 1,68 x 106 m³. The development progress has been a delay recently and it needs work accelaration, one of them is with review design method of river diversion from tunnel becomes diversion conduit. The research aims at explaining review design method by analyzing its hydraulics to get the size of cross section area and analyzing cost and time to compare from diversion tunnel becomes diversion conduit. From the research result, it is resulted open channel dimension and conduit channel and comparison cost and time. Open channel dimension is obtained base width B = 4,75 m, water level h = 4,133 m and guarding height for its channel 1,434 m, the size of conduit cross section area is 2,935 ~ 3 m. Time effectiveness that can be resulted through the alternative of river evasion acceleration with conduit is as much as 64 days and cost efficiency that can be resulted is as much as 60.430.817.556,42 rupiah.} }