@thesis{thesis, author={MOCHAMMAD LATIF YUSUF ROMADHONI YUSUF}, title ={INSTALLATION LABOR EFFECTIVENESS ANALYSIS COLUMNS ON BUILDING CONSTRUCTION PROJECTS MOJOAGUNG HEALTH CENTER}, year={2024}, url={http://repository.undar.ac.id/id/eprint/1028/}, abstract={A construction project is a form of activity that takes place for a limited period of time, with certain resources, to achieve results in the form of buildings or infrastructure. One of the keys to the success of a project depends on Human Resources by reviewing the effectiveness and productivity of the workforce. In building construction projects, effectiveness is used as an effort to complete the project effectively and efficiently. The results in this study were obtained to reduce the effectiveness of the workforce on the 2nd floor. The average effective working time of groups A and B is 95.608%, with the details of Group A on the first floor with a percentage of 96.05%,} }