@thesis{thesis, author={Kresmawanto Heri}, title ={ANALISA RUGI TEGANGAN JTR DESA JUWONO KEC. NGRONGGOT. KAB. NGANJUK PADA GTT 025}, year={2021}, url={http://repository.undar.ac.id/id/eprint/1500/}, abstract={Voltage stability, system reliability and service continuity are things that must always be prioritized by PT. PLN in order to fulfill customer/customer service and satisfaction. In connection with the expansion of customers in Juwono Village, the community's need for electrical energy also increases, so that the stability and reliability of the electrical installation needs to be maintained so that the voltage sent from the substation to the customer's end does not occur too large losses. Because the cable is too long and the load is too large on the A side and the C side, there will be a voltage drop at the JTR Juwono Village, Kec. Ngronggot Kab. Nganjuk at GTT 025. In order to suppress the voltage drop not exceeding the allowable voltage drop based on the analysis, the JTR cable can be replaced with a 70 mm2 AAAC cable or add an insert transformer on the C side. Besides that, because the voltage on the send side is good and 220 volts. Voltage losses that are too large will harm consumers (customers) because voltage user equipment does not get normal voltage and is detrimental to PLN itself. Keywords : GTT-025, JTR, Voltage Shrinkage} }