DETAIL DOCUMENT
PERUBAHAN ALIRAN DAYA DAN TEGANGAN AKIBAT ADANYA PERKEMBANGAN PEMBANGKIT, TRANSMISI DAN BEBAN PADA TAHUN 2018 DIBANDINGKAN PADA TAHUN 2017 DI SISTEM 500 kV PULAU JAWA
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Adiputra, Alvin Dwi Rio
SP, Sampurno
Subject
Teknik Elektro 
Datestamp
2019-11-05 00:32:33 
Abstract :
The development of the Power Plant is proportional to the growth in the load or the growth of electricity consumption. With the development of power plants that are increasingly increasing the year is required addition of the distribution unit from the carrier to the substation, this is done to maintain the reliability of a system, reduce losses and also keep the life of the delivery introduction. Substation is the terminal of a distribution system where the substation serves to raise or lower the voltage. On the island of Java, especially the West in 2018 the need for electrical energy is growing, to maintain the reliability of the system in the addition of Power Station on 150 kV system and also at 500 kV. In order to compensate between electricity provider with demand requirement then made addition of Distribution or Transmission system which will be interconnection to 500 kV system in Java Island and must be considered for power distribution from Power plant to electric users more optimal. In this scipt will be discussed about the comparison of voltage and power flow system 500 kV in 2017 due to the development of electric power system in 2018 in Java. Based on the result of stress value analysis on peak load and light load from 2017 to 2018, there is also a change of value and direction of power flow in some channels Java-Bali system 500 kV. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara