DETAIL DOCUMENT
ANALISIS KINERJA PLTS CIRATA 1 MW ON GRID
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Hidayat, Muhammad Khairani
Hafidz, Mohammad
Subject
Teknik Elektro 
Datestamp
2019-11-05 00:32:48 
Abstract :
Solar power plant (PLTS) on Cirata 1 MW power plant in Purwakarta is On large scale Grid built by PLN. PLTS on Cirata supply power directly to the network and to kV PLN 20 lane loads that are local. Since the PLTS on Cirata operates October 2015, yet little-known potential for optimum electrical energy, final results/final yield (YF), and the performance ratio (PR) is a parameter-the performance an PLTS. So that needs to be done on Cirata PLTS performance related analysis and constraints that occur on the PLTS on Cirata. To find out the optimum potential on Cirata PLTS associated with performance parameters then done using simulation software PVSyst without regard to factors which then results from shading simulation software compared to the results of the production. The difference in energy production in the October-March 2017 difference amounted to 16.64%, 5.2%, 34%, 5.2%, 24%, 10.4%. Performance ratio (PR) real PLTS on Cirata in October 2016-March 2017 in a row is 79%; 84%; 59%; 93%; 68% and 79%, average lower than PR PLTS on Cirata from simulated results in October 2016 s/d March 2017 consecutive amounted to 89%; 88.9%; 89.4%; 88.3%; 88.6% 88.6%. The results of economic feasibility, PLTS on Cirata is said to be worth it because after reaching the age limit of the PLTS on Cirata of 25 years, the initial capital or initial investment with BEP occurs in 5 year by logging in can cash PLTS on Cirata value NPV of Rp 18.171.467.681 
Institution Info

Institut Teknologi Perusahaan Listrik Negara