DETAIL DOCUMENT
PERANCANGAN PENGGUNAAN PLTS SISTEM DC PADA MERCUSUAR PANTAI PANDANSARI YOGYAKARTA
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Sufriadi, Ridha Hayani
Tagore S, Masbah Rotuante
Subject
Teknik Elektro 
Datestamp
2019-11-05 00:32:56 
Abstract :
The energy of the sun is massively available, non-polluting, infinite and free. Therefore, this energy resource is utilized to generate power through the PLTS (Solar System Power Plant). This thesis will discuss the Off-grid PLTS system planning, with a lighthouse in Pandansari beach, Yogyakarta as the load. This PLTS is designed to fulfill the power supply with an estimation of energy load around 1500 Wh for 12 hours, from 18.00 pm ? 06.00 am, replacing the use of a diesel generator. This plan refers to the lighthouse standardization in the American continent, of which the whole components are using DC electrical source and a more efficient tool utilization.. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara