DETAIL DOCUMENT
ANALISIS KINERJA SISTEM KONTROL PEMBANGKIT LISTRIK TENAGA MIKRO HIDRO MELONG SUBANG, JAWA BARAT
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Irfan, Muhamad Nurul
Hafidz, Mohamad
Subject
Teknik Elektro 
Datestamp
2019-11-05 00:33:20 
Abstract :
Micro Hydro power plant is a power plant water restricted capacity between 5 KW ? 200 KW pu. The main components of PLTMH Melong is Civil Buildings, Mechanical Components and Electrical Componentscomprising generator and control system, control system on PLTMH Melong there are two parts that musat be kept constant so that PLTMH always operate is voltage and frequency, controlled voltage can be set with AVR (Automatic Voltage Regulation) for the type of synchronous generator type STAMFORD, UCI 274E. If for frequency can be set with guide vane electro governor hydraulic. PLTMH control system of setting the Active Power(P) produced at the output of the generator is need for Reactive Power (Q), Apparent Power (S) affecting the performance of the control system and compared to the ETAP programme 12.6.0 
Institution Info

Institut Teknologi Perusahaan Listrik Negara