PENGARUH OPERASI PLTU BATANG 2 X 1000 MW TERHADAP SISTEM TENAGA LISTRIK 500 KV DI JAWA-BALI
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Nainggolan, Christian Andreas Oktaviano
Sampurno, Sampurno
Subject
Teknik Elektro 
Datestamp
2019-11-08 04:01:59 
Abstract :
In connection with the planning of PT PLN (Persero) to build a power plant with a capacity Trunk 2 x 1000 MW, which is currently under construction and is expected to enter into interconnection 500 kV system in Java and Bali in 2019. So with the operation of the power plant will lead to changes in conditions operating at 500 kV interconnection system in Java-Bali. The changes that occur are: changes in power flow, the value of the voltage, short circuit current, power losses on the channel and frequency stability in the event of failure of the operation (shutdown) on the Trunk power plant 2 x 1000 MW. Trunk Power Plant 2 x 1000 MW using coal fuel vapor pressure Ultra superkritikel. Given the characteristics of the power plant Batang already mentioned, the power plant Batang need special attention in terms of loading. both normal operation and abnormal operation (disruption). In connection with this it is necessary to study the changes in power flow and changes the voltage value at the time of the power plant Stems 2 x 1000 MW, was included in the 500 kV interconnection system in Java and Bali. To the authors take the title of the thesis "Effect of power plant operation rod 2 x 1000 MW at 500 KV STL operation in Java-Bali" 
Institution Info

Institut Teknologi Perusahaan Listrik Negara