Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
MUSTAJAB, AMIRUL
Marsudi, Djiteng
Subject
Teknik Elektro
Datestamp
2019-11-08 04:11:22
Abstract :
Electric power system consists of plants, transmission networks (substation and transmission lines) and distribution network. In an effort to improve service reliability of electric energy supply electric power system is very important. Extra High Transmission Line 500 kV capable of delivering large amounts of power (1000-1500 MW), interference on this channel is very disturbing course of its operation system can even lead to total disruption in the system therefore protection relays on line 500 kV open PMT should work in the shortest time probably so as not to disturb the stability of the system, after PMT trip by relay, a disorder should be sought as soon as possible to do repairs. In this paper will discuss a technique locate interference in the work SUTET by recording the disturbance fault during a transient period