DETAIL DOCUMENT
ANALISA PERHITUNGAN SETTING RELE JARAK PADA SUTT 150 KV GI CENGKARENG–DURI KOSAMBI
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
JAMALUDIN, JAMALUDIN
Willy BS, Purnomo
Subject
Teknik Elektro 
Datestamp
2019-11-19 09:03:20 
Abstract :
The condition and reliability of electricity supply has now become an indicator of national economic growth. PLN as the company that manages the supply of electricity is always trying to improve the availability and reliability of electricity for consumers. Protection on the transmission line will determine the reliability of electricity that needs serious attention in planning is no exception setting is relay protection equipment. Rele rele distance is most widely used as the primary safety on High Voltage Air Channel. The data used to determine the distance relay settings such as the type of data conductors CT, PT and determine L1, L2, L3. Based SPLN shared security zones, namely Zone 1, Zone 2 and Zone 3. Determination of the zone using this data. Based on the relay setting calculations that have been done there is a difference with the setting-Duri Kosambi assisting Cengkareng. However, taking into account the errors of the data kostantasaluran, CT, PT and equipment other 20% is still within the scope of SPLN 
Institution Info

Institut Teknologi Perusahaan Listrik Negara