PERENCANAAN SISTEM TENAGA LISTRIK DI PERTAMBANGAN BATU BARA KAWASAN INDUSTRI PAMA-1
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Nurrahmi, Miftha
Hariyanto, Agung
Subject
Teknik Elektro 
Datestamp
2019-12-05 12:39:02 
Abstract :
These days electricity has become a very important part in all aspect of life. Increasing population growth every year, the development of technology and human lifestyles effect in economics need. With increasing economincs need, the demand energy also increases. To fulfill energy demand, Indonesia is very dependent on fossil power plant. More than 88% electricity is produced from fossil fuels. Around 60% from coal, 22% from natural gas, 6% from oil and only 12% is generated from renewable energy. Coal is a fuel that plays an important role on electricity power system. PT. Pamapersada (PT PAMA) make electricity power system for Internal PAMA Group by using results from them mine. Where is power plant is used in operation electricity power system is electric steam power plant (2x15 MW). In the process of the electricity system itself, it is predicted that there will be load growth of 5% every year. Then load produced on 2019 is 3.86 MW, 2020 is 4.04 MW, 2021 is 4.22 MW, 2022 is 4.39 MW and 2023 is 4.57 MW. Load growth will be input to system analysis application with using load flow simulation Newton-Rhapson method. So, it will be known drop voltage, load losses and delivery loading ability which increases every year. From the result of power system analysis simulation known load demand and production from power plant. Where is the result of the load demand there is still excess power of 10.43 MW on 2023. So that excess power will be advised to sold to PLN Puruk Cahu, Central Kalimantan 
Institution Info

Institut Teknologi Perusahaan Listrik Negara