KAJIAN KINERJA DAN PEMELIHARAAN PEMBANGKIT LISTRIK TENAGA SURYA BUNAKEN 335 kWp
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Sis, Fauziah Haryanti
Januwarsono, Santoso
Subject
Teknik Elektro 
Datestamp
2019-12-05 12:45:29 
Abstract :
Bunaken Solar Power Plant 335 kWp is one of the power plants built on the islands that are not inter-connected with the PLN electricity grid system. The electricity system on Bunaken Island was previously supplied by the Bunaken Diesel Power Plant which operates for 12 hours per day and after the Bunaken Solar Power Plant operates with a capacity of 335 kWp, the Bunaken electricity system operates 24 hours per day. Since the operation of Bunaken Solar Power Plant 335 kWp has not been known the optimum electrical energi potential, final yield (YF) and performance rasio (PR) which are the performance parameters of a solar power plant. So it is necessary to do a study related to the performance of Bunaken Solar Power Plant 335 kWp, so that the operating system can also be known and constraints that occur in the Bunaken Solar Power Plant. To find out the performance parameters of the Bunaken Solar Power Plant, comparisons were made when the solar power plant first operated (2011) and currently (2018). Based on the calculation, the performance rasio (PR) has decreased by 35,19%. The low performance of Bunaken Solar Power Plan tis caused by internal and external factors. To maintain the performance must also be made at the Bunaken Power Plant such as maintenance of solar module, inverter, battery, and replacement of components. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara