DETAIL DOCUMENT
Perencanaan Sistem Pembangkit Listrik Tenaga Surya Off-Grid Pada Gedung Perkantoran BKKBN Watampone, Sulawesi Selatan
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Hardyanti, Andi Dyah Harum
Makkulau, Andi
Subject
Teknik Elektro 
Datestamp
2019-12-05 12:47:53 
Abstract :
In this research PLTS planning will be made by utilizing the roof of Office Buildings because it is in accordance with ESDM ministerial regulation No.49 of 2018 regulating basic matters to encourage the acceleration of solar energy development, especially rooftop solar (solar panels), in Indonesia. Solar energy is a renewable energy source that is abundantly available in Indonesia. One way to use solar energy is to convert it to electrical energy using photovoltaic modules or solar modules called solar power plants (PLTS). In this study using a technical and economical analysis method to plan the PLTS system as a source of electrical energy in office buildings. The PLTS is designed to supply electricity supply with an estimated daily energy demand of around 38.02 kWh. In PLTS Off-Grid planning, a land area of 52 m2, 4 arrays is needed with 48 solar panels arranged in 2 series and 6 parallels. The components needed in this plan are 4 SCC, 12 batteries and 1 inverter with an annual power output of 15840.63 kWh / year. Performance Ratio (PR) in the PLTS system as a reference that this system is feasible to realize with a PR value of 88% with starting investation of IDR. 623.430.000 which includes the costs for the PLTS system components and installation. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara