PENYEIMBANGAN BEBAN JARINGAN TEGANGAN RENDAH DENGAN METODE PECAH BEBAN UNTUK MENGATASI BEBAN LEBIH PADA GARDU DISTRIBUSI
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Pongtandi, Yoel Fadli
Ispranyto, Edy
Subject
Teknik Elektro 
Datestamp
2022-11-02 03:27:15 
Abstract :
The electric power distribution system is a system for distributing electricity from a 220/380 Volt distribution transformer to 1 phase or 3 phase customers, Low Voltage Network or JTR, is a distribution system that has a wide scope so that load imbalances and overloads often occur. Therefore, a load breaking method must be used to overcome this problem. Many things are caused by overloads and load imbalances such as: decreased transformer performance, excessive heat in the secondary phase wire from the transformer to the PHB-TR, which ultimately reduces the quality of the electric power system to consumers. The steps taken to overcome this problem are the load-breaking method, namely, by dividing the load on the substation that experiences an overload or high load to the nearest substation with a low load. This overload case can be detected based on the disturbance report data, namely Phase R = 175 A, S = 150 A, T = 174 A PT. PLN (Persero) UP3 Bintaro. At the CD 155 substation, referring to one of the majors A, the CD 155 substation with a load of 144 A. So after the load breaking method was carried out, the result was 97 A in the A department so that 47 A was reduced, it can be ascertained that the CD 155 substation A was normal without there is a higher load. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara