Abstract :
PLTS planning at Graha YPK PLN is needed as a back-up or replacement system to reduce the use of conventional electricity. The On Grid system is a Solar Power Generation system that is not connected to the PLN electricity network. This On Grid system is also called a auxiliary system because PLTS still requires a supply from PLN by using a solar module as a producer of electrical energy in accordance with the required needs. Planning a 52 m2 On Grid Solar Power Plant with PLTS components in the form of 24 modules installed with 450 Wp solar panels, 1 Inverter with a capacity of 15330 Watt, Solar radiation for 2021 on average is 4.67. The energy cost of PLTS Graha YPK PLN 52 m2 is Rp. 1,444,70/kWh with imports of 9,240.4 kWh/Month and exports of 1380,61 kWh/Month. By economic calculation, the total investment cost in this plan is Rp. 257,105,000 with a payback period of 16 years. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara