DETAIL DOCUMENT
IDENTIFIKASI FAKTOR YANG BERPENGARUH TERHADAP KINERJA WAKTU PELAKSANAAN PROYEK PEMBANGUNAN SALURAN TRANSMISI 150 kV DI WILAYAH KABUPATEN TANJUNG JABUNG BARAT PROVINSI JAMBI
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Vikoreza, Hasri
Alvianingsih, Ginas
Subject
Teknik Elektro 
Datestamp
2022-11-07 06:36:03 
Abstract :
A transmission line on the power electricity system is a media that used to transmit electricity energy from the power plant to load center. In accordance increases the demand of electricity power energy for West Tanjung Jabung Regency Jambi Province, therefore, additional electricity infrastructure development is needed, including the construction of 150 kV transmission lines. In the process of implementing the construction of a 150 kV transmission line, there are various factors that affect the performance of time, so this research is carried out to identify factors that affect the performance of implementation time. The result of the research that has been done are that there are 25 factors that have been an influence on the performance of the project implementation time, and from the value of Relative Importance Index (RII) the result are 0,91 for land acquisition process and design error, 0.87 inaccurate survey data factors, design changes, the length of the review process, 0.86 inadequate investigation factors, 0.83 factors for inappropriate construction methods, 0.82 factors for material delays and social problems, 0.81 factors of incompetent subcontractors, 0.80 factors of lack of manpower, non-smooth manpower mobilization, lack of work equipment, 0.79 factors of financial problems, 0.78 factors of inadequate experienced workers and work equipment that is often damaged, 0.77 factors poor coordination, 0.76 factor of error in cost estimation, 0.75 factor of disorganized safety administration, 0.74 factor of project design complexity level, 0.72 factor of absence of safety officers, 0.71 factor of low productivity of workers, 0.70 factor of difficult project location geographical conditions , 0.69 worker's pending completion factor an, 0.66 the factor of the addition of the scope of work outside the contract. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara