DETAIL DOCUMENT
Optimalisasi Hibrida PLTD 2x2,2 MW Solar Sell di Pulau Karimunjawa
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Purnawan, Muhamad Herry
Fatah, Martin Choirul
Subject
Teknik Elektro 
Datestamp
2022-12-02 07:44:09 
Abstract :
Karimunjawa Island is an ocean tourism destination located in the northern part of Central Java with a 2x2.2 MW DPP as the main support for electricity. The electricity demand increased 226% or 2.26 times within 3 years from 2018-2021. The demand is estimated to reach 3.6 MW (1097% or 10.97 times) in 2041. Following RUPTL 2021-2030 to reduce global climate change, including the gradual reduction of this diesel power plant, it is necessary to conduct a study first related to financial and environmental feasibility for the operation of the existing 2x2.2 MW DPP which is integrated with SPP later. The design installed capacity of SPP ? DPP Hybrid is 2 MW, by using the website application www.globalsolaratlas.com, the output photovoltaic is adjusted to the load profile of the local area, which is around 700-1100 kWh/day. The economic calculation of SPP hybrid produces NPV value> 0 which is Rp. 39 billion, BCR > 1 which is 1.42, IRR > 10% which is 15.7%, and PBP < 20 years which is 6.01 years, this indicates that hybrid solar power plant investment is feasible. The use of fuel can be reduced by 25% in the 1st year and 7% in the 20th year as well as CO2, CH4 & N2O exhaust emissions, also decreased by 11% for 20 years. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara