ANALISIS PEMASANGAN GARDU SISIPAN DAN PERAMALAN BEBAN GUNA PERBAIKAN JATUH TEGANGAN PADA JARINGAN TEGANGAN RENDAH GARDU DISTRIBUSI JSCI PT.PLN (Persero) UP3 INDRAMAYU
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Brilliawan, Ado Sesar
Azzahra, Septianissa
Subject
Teknik Elektro 
Datestamp
2023-06-16 07:16:36 
Abstract :
In the distribution of electric power systems, a good level of service quality is required. Good voltage supply is a must. Based on SPLN No. 1: 1978, the maximum service voltage is 5% and the minimum service voltage is 10% of the nominal voltage, which is 380/220 Volts. So if there is a voltage drop, it must be repaired immediately. As in Jatisura, Cikedung Village, the working area of PT PLN UP3 Indramayu, the distribution of electricity at that location experienced a voltage drop due to the low voltage network of the JSCI substation 3 which was too long, namely 791 meters with a fairly high load. Therefore, it is necessary to repair the load breaking method with an insert substation. This method is carried out by transferring the entire load of the 3rd major JSCI substation to the insertion substation. The magnitude of the voltage drop at the JSCI substation at the end pole of the 3rd direction is measured at 194 Volts R phase, 185 Volts S phase, 197 Volts T phase It is planned that an insert substation equipped with 2 directions will be built in the middle of the 3-way network of JSCI substations in order to be able to divide the distance to get optimal results. As a result of these improvements, the voltage received by the customer is 215 Volts in the R phase, 215 Volts in the S phase, and 216 Volts in the T phase. Meanwhile, before the repair, the voltage received by the customer was 194 Volt R phase, 185 Volt S phase, and 197 Volt T phase. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara