Abstract :
The electricity distribution network at PT PLN (Persero), especially the Pasarwajo
Customer Service Unit work area, has three feeders supplied from PLTMG 30 MW,
PLTD Pasarwajo 5x1 MW and PLTM Winning 1.6 MW. In 2023 from January to March,
it was recorded that there was one feeder named as Lasalimu feeder which had
experienced 57 interruptions, some of which experienced a failure of protection
coordination. This problem underlies this research with the aim of studying the protection
system on Lasalimu feeders using ETAP 16.0.0 software. The method used in this study
is a quantitative method. Based on the simulation, the short circuit currents of 3 phases, 2
phases and 1 phase to ground in the Lasalimu feeder are 778 A, 674 A and 377 A, while
based on the calculation the results are 774 A, 670 A and 382 A. From the short circuit
current value, t value of the OCR Lasalimu Feeder T setting is 0.256 s and GFR 0.269 s,
the Walompo OCR Recloser setting is 0.154 s and GFR 0.189 s and the Siontapina OCR
Recloser setting is 0.07 s and GFR 0.024 s. The simulation results of protection
coordination at 30%, 60% and 90% of the channel length work selectively. According
this simulation?s result, it can be concluded that overall the OCR and GFR settings are
still in good condition. The difference between the simulation results and field
implementation is caused by several factors such as load density, network operating
patterns and conditions of protection equipment.