KAJIAN PENGARUH BEROPERASINYA PLTS 2 MW BIMA TERHADAP SISTEM 20 kV BIMA
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Estiawan, Muhamad Alfian
Haryanto, Agung
Subject
Teknik Elektro 
Datestamp
2019-10-28 04:26:49 
Abstract :
Under the government policy in PP No.40 in the year of 2012 that has been replaced by PP No.23 in the year of 2014 for electricity generation efforts, about the development of electrical power in NTB (Nusa Tenggara Barat) prioritizes to utilize its potential in primary renewable energy, especially solar power. As for now, a Solar Power Plant for Systems in Bima is under planning. To be precise, a 2 MW Solar Power Plant taking place in Bima that will be gridded to 20 kV interconnected system and is expected to be operational in 2019. To propose a construction plan, a study for voltage load flow, frequency, and short circuit current is necessary. In this thesis the writer talks about the operational influence of Solar Power Plant to 20 kV operational system with a main study area in load flow analysis and voltage analysis. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara