PERENCANAAN PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) MENGGUNAKAN SISTEM OFF GRID PADA BASE TRANSCEVIER STATION (BTS) TELKOMSEL DI PULAU BIDADARI
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Dihandono, Setyo
Koerniawan, Tony
Subject
Teknik Elektro 
Datestamp
2019-10-28 04:30:03 
Abstract :
A system has the energy needed by human to fulfill life. Location used in the design of PLTS for tower base transceiver station located in Pulau Bidadari, Kepulauan Seribu, Jakarta. where the base station transceiver station is the giver and capture the signal data source used to communicate the local residents. To facilitate the design of this PLTS using off grid system. The solar panel used has 230 Wp power and requires as many solar panels as 70 units of PV. the installation of the PLTS gives an estimated cost savings of Rp. 543.693.915, - and based on the calculation of the calculation that this is feasible to apply. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara