DETAIL DOCUMENT
ANALISA SETTING RELE DIFFERENSIAL PADA GENERATOR PT PJB UBJ O&M PLTU REMBANG
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Mercury, Maharani Ratna
Hajar, Ibnu
Subject
Teknik Elektro 
Datestamp
2019-10-28 04:33:24 
Abstract :
PT PJB UBJ O&M Rembang PLTU is one of the Java Bali steam power plants, which the output that produced by the Rembang PLTU generator is 315 MW, generator is the core equipment of system which has different operating characteristics and protection systems, Disturbances in generators include damage to generators or auxiliary devices, single-phase short circuit current, three-phase short-circuit current and imperfect electrical contacts. To avoid such interference, a protection system is needed, one of which uses differential relay. This differential relay works very fast and does not require time delay by detecting the difference in the current entering the stator coil, if the current is different then the differential relay will work. The purpose of this study was to analyze the differential relay settings on generators at PT PJB UBJ O&M Rembang PLTU which affect the reliability of the generator. The method used in this study is a quantitative method, where in this method a research approach is widely demanded to use numbers from data collection, processing of data, and appearance of the results. The results obtained from this study suit the differency of 0.1804 A, which means it is still in good condition, so it can carry out its duties as a protection system at PT PJB UBJ O & M Rembang PLTU 
Institution Info

Institut Teknologi Perusahaan Listrik Negara