Abstract :
The demand for electrical energy increases as time goes on.The demand in Lombok system growth 8% each year.In order to accommodate this growth necessarry needs to added new power plant,line transmission and also a new substation. In order to enforce the government?s policy, PT. PLN has already created a work plan for the supplying of electrical power (RUPTL).Mostly added power plant in Lombok system dominance with coal power plant and Gas Power plant,which is needed to reduce solar consumption and to reduce the cost to generate electricity (BPP). The purpose of the evaluation is to understand the effects caused with the added new power plant,transmission and also new substation according to RUPTL 2018-2027 by analyze the load flow,Voltage level in each Substation and Short circuit analysis which is impact the Lombok system. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara