DETAIL DOCUMENT
ANALISIS PENENTUAN KAPASITAS MAKSIMUM PENETRASI PEMBANGKIT LISTRIK TENAGA BAYU PADA SISTEM 150 KV BANGKA
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
Ramadhan T, Muh. Febriyanto
Prianda, Prianda
Subject
Teknik Elektro 
Datestamp
2019-10-29 03:29:32 
Abstract :
Bangka Island in Bangka Belitung province has much potential energy that comes from nature such as wind, solar heat and etc. If utilized, it will be a huge potential alternative of power generation. Growth of electricity will continuously be increasing, therefore power generation will also keep adding its electricity supply. In order to fulfill customers' electricity need, the renewable energy generation in this case can be developed and becoming a renewable energy source. The source of wind power is derived from nature (wind) and possesses many advantages, but the intermittent nature of the wind power plant is going to disturb the system's stability. A simulation was done to determine maximum penetration of wind power plant to Bangka 150 kV system with some cases of operation backup and different wind turbine capacities as well as the biggest plant outage scenarios on the system. The simulation done by the system's frequency according to the grid code, the wind power plant for Bangka's 150 kv system is equal to 1 largest unit existing in the system. Where the largest unit capacity is 50 MW. 

File :
Fix ke 1.pdf
Institution Info

Institut Teknologi Perusahaan Listrik Negara