Abstract :
Switch yard is a part of electrical installation that consists of several electrical equipment systems and as a connection from electrical transmission to its primary distribution. Switch yard transforms power with higher voltage to lower voltage and vice versa and it has many other crucial function. Switch yard demands intensive maintenance. Because of its vital role, if an error or interferences happened in the switch yard therefore the activities that depended on that switch yard will be hindered and will cause several damage to PLN as the provider , to be precise in their economical area. The research done is about the comparator between investing value in the components of Ciledug 150kV Substation and New Senayan 150kV GIS. Because of switch yard important role, therefore in Ciledug 150kV Substation and New Senayan 150kV GIS, there will be an operational comparation about the frequency of interferences. If there was an interference, there would be a maintenance in the switch yard and therefore the cost of this maintenance would be compared in Ciledug 150kV Substation and New Senayan 150kV GIS. And looking from the side of the are between the two Substation and comparing the cost of the are between Ciledug 150kV Substation and New Senayan 150kV GIS. 
Institution Info

Institut Teknologi Perusahaan Listrik Negara