Abstract :
Mini Hydro Power Plant (PLTM) is one of the alternative renewable energy. Pekalongan as a research area that has not been passed. In this case the mainstay debit components and capacity that became the focus of research on the Genteng river in the area Pekalongan. Rainfall, river flow, and other runoffs become theoretical data to determine the flow of Genteng river and made the flow duration curve. Where available debit mainstay discharge for generating capacity. While in addition to the specified discharge data, high-capacity data generating capacity and efficiency of mechanical and electrical equipment. The data will be able to determine how much capacity can be generated from the river Genteng.