Perencanaan Pembangunan Pembangkit Listrik Tenaga Surya Rooftop Menggunakan Sistem On Grid Di Gedung Main Power Station Bandara Internasional Soekarno-Hatta
Total View This Week0
Institusion
Institut Teknologi Perusahaan Listrik Negara
Author
RAHARDI, MUHAMMAD ALFIAN
Marsudi, Baruno
Subject
Teknik Elektro 
Datestamp
2019-11-05 00:29:41 
Abstract :
Main Power Station of Soekarno Hatta airport is a place that need high reliability because the power is used 24 hour per day. Therefore, we need a support power plant as an alternative power supply that works operationally in the night replace PLN power supply to increase efficiency andeffectiveness. Soekarno Hatta airport which placed in Jakarta has sun radiation potential 4.57 kWh/m2 is a good place to built a solar system power plant using On-Grid system. For area saving and maximum sun radiation we can use the rooftop to place the solar panel. 