Abstract :
Scheduling is the form of policy corps to determine process which must be
done and how long the processes walk. Constitute is difficult to optimate time of
solving of an existing project so that can pursue process workmanship of other
projects. Difficulty in determining which project must be done beforehand and
remember the limited available resource.
Genetic Algorithm is used to schedule workmanship of project with limited
life. This algorithm require parameter of genetic and use operator of genetic like
selection, mutation and crossover to yield a makespan minimation output. From
the minimize makespan then we got a sequence scheduling of optimum project.