DETAIL DOCUMENT
Animasi 3d Jembatan Komposit Pada Jembatan Sungai Bengkalis
Total View This Week0
Institusion
Politeknik Negeri Bengkalis
Author
Shafwan, Muhammad
Subject
421 Teknik Sipil 
Datestamp
2021-03-22 10:43:00 
Abstract :
The Bengkalis river bridge, which is 14 meters long and 7 meters wide, is a bridge that connects the Bengkalis road. This bridge suffered damage to the pillars of the bridge and the abutments, so the bridge would not last for a long time. Therefore, the bridge needs to be re-planned. This research is a qualitative research that will explain the method of implementing composite type bridge work with the final result, namely a 3D animation video. The result of this research is that a 3D animation video is formed which explains the method of implementing the composite method bridge work starting from mobilization, dismantling the old bridge, diversion of traffic flow, installing piles and casting the work floor, abutment work, laying steel profiles, joining steel profiles, welding of shear connectors, road plate work, oprit, tread plate, asphalt laying, and finishing. 
Institution Info

Politeknik Negeri Bengkalis