DETAIL DOCUMENT
Rancang Bangun Alat Monitoring Kegagalan Fasa dan Analisa Beban Listrik Pada Instalasi 3 Fasa Berbasis IoT Melalui Aplikasi Blynk
Total View This Week0
Institusion
Politeknik Negeri Bengkalis
Author
Akbar, Fadhil
Subject
451 Teknik Elektro 
Datestamp
2024-09-04 07:48:42 
Abstract :
Electrical energy has become a basic need both in installations and industry, many things that cause phase loss occur due to phase failures that occur, this requires a phase failure protection device caused by rising or falling voltage which is usually called under or over voltage, especially on a 3 phase voltage system. This tool is designed to use 3 AC regulators to simulate phase failure, over or under voltage at voltages <220 or >220. Blynk will send notifications and alarm sounds in voltage conditions of 130 V AC for undervoltage and 230 V AC for overvoltage, the duration of sending notifications and alarm sounds on Blynk, when a phase failure occurs is around 1-2 seconds, with an average time delivery is 1.3 seconds, or you could say it immediately sends a notification and an alarm sound when a phase failure occurs. In testing this tool, the tool worked well, namely 80%. 
Institution Info

Politeknik Negeri Bengkalis